BTC: 39.08496732
ETH: 1,181.58466706
Flooring
• Carpet
• Tile
Heating
• Central
Cooling
• Central Air
Appliances
• Electric Water Heater
• Dishwasher
• Disposal
• Dryer
• Microwave
• Refrigerator
• Self Cleaning Oven
• Wall Oven
• Washer
Other interior features
• Closet Cabinetry
• Fire Sprinklers
• Entrance Foyer
• Laundry Tub
• Split Bedroom
• Storage
• Utility Room/Laundry
Bedrooms and bathrooms
• Bedrooms: 2
• Bathrooms: 1
• Full bathrooms: 2
Parking
• 2 Or More Spaces
• Assigned
• Garage-Under Building
• Parking Garage
• Parking-Under Building
Property
• Levels: 1
• Pool Private: Yes
• Exterior Features: Built-In Grill / Open Balcony / Tennis Court(s)
Other Property Information
• Parcel Number: 50434411050021030
• Zoning: PUD-B(
Type and style
• Property Type: Residential
• Property Sub Type: Condominium
Utility
• Cable Connected
• Sewer Connected
• Underground Utilities
• Water Connected
• Cable Available
• Sewer Available
• Water Available
Other financial information
• HOA: $3,279
• HOA Frequency: Monthly
• Annual tax amount: $24,870
Source details
• MLS ID: B26043985
Other facts
• Construction Materials: Concrete Block Construction
• Laundry Features: Laundry Tub / Laundry Room / Utility Room/Laundry
• Patio And Porch Features: Open Balcony
• Pool Features: Community
• Window Features: Complete Impact Glass
• Direction Faces: North
• Other Structures: Livable
• Waterfront: Yes
• Garage Spaces: 2
• Attached Garage: Yes
• Garage: Yes
• Living Area: 2494
• Water Source: Public
• Subdivision Name: TWO THOUSAND CONDO
The multiple listing information is provided by the Miami Association of REALTORS® from a copyrighted compilation of listings. The compilation of listings and each individual listing are ©2026-present Miami Association of REALTORS®. All Rights Reserved. The information provided is for consumers' personal, noncommercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. All properties are subject to prior sale or withdrawal. All information provided is deemed reliable but is not guaranteed accurate, and should be independently verified. Listing courtesy of: Douglas Elliman